鋼結構雨棚的施工要注意什麼│₪◕₪?
來源₪╃:http://www.jadesum.com/ 日期₪╃:2022-04-19 釋出人₪╃:admin
1✘↟▩☁、鋼結構雨棚加工預備及下料₪╃:依照施工圖放樣↟✘◕,放樣和號料時要預留焊接收縮量和加工餘量↟✘◕,依據放樣作樣板▩·☁。鋼材糾正₪╃:鋼材下料前有必要先進行糾正↟✘◕,糾正後的誤差值不該超越規範規則的答應誤差值↟✘◕,以確保下料的質量▩·☁。熱加工的型鋼先熱加工↟✘◕,待冷卻後再號孔▩·☁。鋼板預埋件及其他零件切割鑽孔及噴防腐漆處理▩·☁。
1. Processing preparation and blanking of steel structure canopy: setting out shall be carried out according to the construction drawing. During setting out and marking off, the welding shrinkage and machining allowance shall be reserved, and the template shall be made according to the setting out. Steel correction: it is necessary to correct the steel before blanking. The error value after correction should not exceed the allowable error value of the specification rules to ensure the blanking quality. The hot processed section steel shall be hot processed first, and the hole shall be numbered after cooling. Steel plate embedded parts and other parts shall be cut, drilled and sprayed with anti-corrosion paint.
鋼結構雨棚施工
Construction of steel structure canopy
2✘↟▩☁、丈量放線₪╃:依據土建標高基準線測預埋件標高中心線↟✘◕,檢視預埋件標高誤差✘↟▩☁、左右誤差▩·☁。收拾成果↟✘◕,斷定預埋件分隔的調整處理計劃▩·☁。沿樓板外沿彈出墨線定出預埋件頂標高線▩·☁。
2. Measurement and setting out: measure the elevation center line of embedded parts according to the civil elevation datum line, and check the elevation error and left-right error of embedded parts. Collect the results and determine the adjustment and treatment plan for the separation of embedded parts. Snap an ink line along the outer edge of the floor to determine the top elevation line of the embedded parts.
3✘↟▩☁、預埋件裝置處理₪╃:鋼結構雨棚的定位預埋件裝置方位↟✘◕,打鑽裝置▩·☁。請求預埋件方位精確✘↟▩☁、埋設結實▩·☁。標高誤差不大於9mm↟✘◕,左右位移不大於20mm▩·☁。
3. Treatment of embedded parts device: positioning of steel structure canopy, orientation of embedded parts device and drilling device. The embedded parts are required to be accurate and firmly embedded. The elevation error shall not be greater than 9mm, and the left and right displacement shall not be greater than 20mm.
4✘↟▩☁、懸掛臂裝置焊接₪╃:本工程懸掛臂長度超越7.2米↟✘◕,裝置選用焊接↟✘◕,鋼角碼加強固定▩·☁。裝置前要先調理懸掛臂規劃坡度↟✘◕,精確無誤方能進行焊接▩·☁。靠邊一條懸掛臂精確無誤後↟✘◕,裝置另一邊一條懸掛臂↟✘◕,就位精確後點焊▩·☁。然後以此兩條懸掛臂為基準拉出懸掛臂的最高✘↟▩☁、最底標高線↟✘◕,逐個焊接剩下懸掛臂↟✘◕,並焊接無縫鋼管拉桿▩·☁。型鋼需接長時↟✘◕,先焊接頭並矯直▩·☁。選用型鋼接頭時↟✘◕,為使接頭型鋼與鋼板預埋件緊貼↟✘◕,應按規劃請求鏟去楞角▩·☁。對接焊縫應在焊縫的兩頭焊上引弧板↟✘◕,其原料和波口型式與焊件相同↟✘◕,校準查驗₪╃:懸掛臂裝置後首要檢視現場銜接部位的質量▩·☁。懸掛臂裝置質量首要檢視懸掛臂豎向面的不筆直度;受壓對懸掛臂豎向面的旁邊面下垂;懸掛臂坡度▩·☁。確保懸掛臂契合規劃受力狀況及全體安穩請求▩·☁。


4. Welding of suspension arm device: the length of suspension arm of the project exceeds 7.2m, the device is welded, and the steel corner code is strengthened and fixed. Before the installation, the suspension arm shall be adjusted to plan the slope, and the welding can be carried out only after it is accurate. After one suspension arm on the side is accurate, another suspension arm on the other side of the device shall be spot welded after it is in place. Then take the two suspension arms as the benchmark, pull out the highest and lowest elevation lines of the suspension arms, weld the remaining suspension arms one by one, and weld the seamless steel pipe pull rod. Straighten the joint and weld the joint first. When selecting section steel joints, in order to make the joint section steel close to the embedded parts of steel plate, the edges and corners shall be removed according to the planning requirements. For butt welds, arc striking plates shall be welded on both ends of the weld, and their raw materials and wave mouth types are the same as those of the weldment. Calibration and inspection: after the suspension arm device, first check the quality of the on-site connection parts. For the quality of suspension arm device, first check the non straightness of the vertical surface of the suspension arm; The side surface of the vertical surface of the compression arm sags; Boom slope. Ensure that the suspension arm meets the planned stress condition and all safety and stability requirements.
鋼結構雨棚
Steel structure canopy
5✘↟▩☁、銜接受力拉索₪╃:定位拉桿基準線✘↟▩☁、標高線↟✘◕,按請求裝置預埋件↟✘◕,焊接拉桿耳板↟✘◕,用高強螺栓銜接拉桿和鋼骨架↟✘◕,拉桿有必要緊固不鬆動▩·☁。鋼結構雨棚不鏽鋼玻璃爪裝置焊接₪╃:按規劃尺度彈出縱橫線及規劃標高↟✘◕,用夾具夾緊↟✘◕,進行定位點焊↟✘◕,裝置結束↟✘◕,焊接玻璃爪底座▩·☁。
5. Connecting the stressed cable: locate the reference line and elevation line of the pull rod, install the embedded parts as required, weld the pull rod padeye, and connect the pull rod and steel framework with high-strength bolts. The pull rod must be fastened without loosening. Welding of stainless steel glass claw device for steel structure canopy: snap the vertical and horizontal lines and planned elevation according to the planned scale, clamp with clamps, conduct positioning spot welding, and weld the glass claw base after the device is completed.
6✘↟▩☁、夾膠玻璃加工製造裝置₪╃:按規劃請求聯絡實測尺度斷定玻璃尺度↟✘◕,以及玻璃的開工方位和孔徑尺度↟✘◕,由廠家加工製造▩·☁。裝置不鏽鋼玻璃爪↟✘◕,玻璃暫時固定後進行調整↟✘◕,調整規範橫平✘↟▩☁、豎直✘↟▩☁、面平▩·☁。誤差不得超越規則誤差▩·☁。
6. Laminated glass processing and manufacturing device: determine the glass scale, as well as the starting position and aperture scale of the glass according to the planning requirements and the measured scale, which shall be processed and manufactured by the manufacturer. The stainless steel glass claw is installed, and the glass is adjusted after being temporarily fixed. The adjustment specification is horizontal, vertical and flat. The error shall not exceed the rule error.
7✘↟▩☁、調整查驗₪╃:點式玻璃進行全體調整查驗↟✘◕,調整規範橫平✘↟▩☁、豎直✘↟▩☁、面平▩·☁。誤差▩·☁。
7. Adjustment and inspection: the point glass shall be adjusted and inspected, and the adjustment specification shall be horizontal, vertical and flat. Error.
產品推薦 / Product recommendations
-
戶外遮陽棚很多的材料及特點
-
泰安遮陽棚的使用對於商鋪有哪些優勢│₪◕₪?
-
伸縮蓬在使用中要注意什麼╃₪!
-
遮陽棚手動與電動的差異有哪些│₪◕₪?
-
遮陽棚手動與電動的差異有哪些│₪◕₪?
-
電動遮陽篷的使用種類有哪些│₪◕₪?
-
遮陽蓬構件加固可採用哪些方式│₪◕₪?
-
電動推拉篷安裝要注意什麼│₪◕₪?
-
電動雨棚的安全性怎麼保證?
-
遮陽蓬五大材質的製作要求介紹!
-
雨棚✘↟▩☁、雨篷和雨蓬三者有什麼不同
-
停車棚廠家的優點
-
電動推拉篷的立柱間距一般是多少的呢
-
電動伸縮檔雨防曬陽光房遮陽棚雨棚挑選注意事項
-
電動推拉蓬的特性和使用過程中需要注意的點
-
伸縮雨棚長時間使用後一定記得檢修
-
電動遮陽棚用途與產品優勢
-
膜結構停車棚如何避免膜面積水
-
推拉雨棚定製的時候客戶應該關心什麼
-
在使用雨棚的時候要怎樣進行保養來延長它的壽命呢│₪◕₪?